Hello!
I have a question about how to modify the lot size of a material.
When building a cost collector, use the KKF6 transaction.
Question: if after the creation of cost collector I have identified that the lot size is incorrect (example: 1 piece), there is a way to change it after it has been created in the transaction KKF6? (example: change from 1 piece to 100 pieces)?
How to do this procedure?
Thank you very much.
I have a question about how to modify the lot size of a material.
When building a cost collector, use the KKF6 transaction.
Question: if after the creation of cost collector I have identified that the lot size is incorrect (example: 1 piece), there is a way to change it after it has been created in the transaction KKF6? (example: change from 1 piece to 100 pieces)?
How to do this procedure?
Thank you very much.